Ravi Prasad, G. V. ; Mahapatra, D. P. ; Punithavelu, A. M. ; Somayajulu, B. L. K. ; Gopalan, K. (2000) Status of the AMS project at IOP Bhubaneswar Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms, 172 (1-4). pp. 66-69. ISSN 0168-583X
Full text not available from this repository.
Official URL: http://www.sciencedirect.com/science/article/pii/S...
Related URL: http://dx.doi.org/10.1016/S0168-583X(00)00357-8
Abstract
The 3 MV tandem Pelletron accelerator facility at the Ion Beam Laboratory of the Institute of Physics (IOP), Bhubaneswar is being augmented by the installation of a fast bouncer system for routine 14C measurements. The old injector involving a single cathode SNICS source and a 45° bending magnet has been replaced by a new system consisting of a 40 cathode MC-SNICS source and a 90° analyzing bending magnet. The system is being tested for transmission. The status of the facility with test results is presented.
Item Type: | Article |
---|---|
Source: | Copyright of this article belongs to Elsevier Science. |
ID Code: | 49801 |
Deposited On: | 21 Jul 2011 10:26 |
Last Modified: | 25 Jun 2012 21:28 |
Repository Staff Only: item control page