Status of the AMS project at IOP Bhubaneswar

Ravi Prasad, G. V. ; Mahapatra, D. P. ; Punithavelu, A. M. ; Somayajulu, B. L. K. ; Gopalan, K. (2000) Status of the AMS project at IOP Bhubaneswar Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms, 172 (1-4). pp. 66-69. ISSN 0168-583X

Full text not available from this repository.

Official URL: http://www.sciencedirect.com/science/article/pii/S...

Related URL: http://dx.doi.org/10.1016/S0168-583X(00)00357-8

Abstract

The 3 MV tandem Pelletron accelerator facility at the Ion Beam Laboratory of the Institute of Physics (IOP), Bhubaneswar is being augmented by the installation of a fast bouncer system for routine 14C measurements. The old injector involving a single cathode SNICS source and a 45° bending magnet has been replaced by a new system consisting of a 40 cathode MC-SNICS source and a 90° analyzing bending magnet. The system is being tested for transmission. The status of the facility with test results is presented.

Item Type:Article
Source:Copyright of this article belongs to Elsevier Science.
ID Code:49801
Deposited On:21 Jul 2011 10:26
Last Modified:25 Jun 2012 21:28

Repository Staff Only: item control page