An integrated approach to solve tool-part grouping, job allocation and scheduling problems in a flexible manufacturing system

Goswami, Mohit ; Tiwari, M. K. ; Mukhopadhyay, S. K. (2006) An integrated approach to solve tool-part grouping, job allocation and scheduling problems in a flexible manufacturing system The International Journal of Advanced Manufacturing Technology, 35 (11-12). pp. 1145-1155. ISSN 0268-3768

Full text not available from this repository.

Official URL: https://doi.org/10.1007/s00170-006-0796-8

Related URL: http://dx.doi.org/10.1007/s00170-006-0796-8

Abstract

An integrated approach is discussed in this article to solve the sub-problems like tool-part grouping, job allocation on machines and minimization of make-span in a FMS. Tool and part grouping is performed using “principal component analysis”, and tool allocation has been carried out using priority-based approach by developing a potency index. Thereafter, the concept has evolved based on threshold machining time, minimum operation time, and maximum possible operation time to minimize the make-span of the system. In order to validate the result “analysis of variance” has been employed, and on a simulated example the F ratio is enumerated.

Item Type:Article
Source:Copyright of this article belongs to 2025 Springer Nature.
Keywords:Principal component analysis; FMS; Job allocation.
ID Code:139861
Deposited On:30 Aug 2025 14:51
Last Modified:30 Aug 2025 14:51

Repository Staff Only: item control page