Shukla, Sanjay Kumar ; Tiwari, M. K. ; Son, Young Jun (2007) Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach The International Journal of Advanced Manufacturing Technology, 38 (1-2). pp. 163-175. ISSN 0268-3768
Full text not available from this repository.
Official URL: https://doi.org/10.1007/s00170-007-1087-8
Related URL: http://dx.doi.org/10.1007/s00170-007-1087-8
Abstract
This paper conceptualizes a bidding-based multi-agent system for solving integrated process-planning and scheduling problem. The proposed architecture consists of various autonomous agents capable of communicating (bidding) with each other and making decisions based on their knowledge. Moreover, in contrast to the traditional model of integrated process-planning and scheduling problem, a new paradigm has been conceptualized by considering tool cost as a dynamic quantity rather than a constant. Tool cost is assumed to comprise tool-using cost and its repairing cost. The repairing cost is considered to depend on the tool-breaking probability, which is predicted by the data-mining agent equipped with the virtues of C-fuzzy decision tree. When a job arrives at the shop floor, the component agent announces a bid for one feature at a time to all the machine agents. Among the machine agents capable of producing the first feature, one comes forward to become a “leader”, and groups other machine agents for the processing of remaining features of the job. Once all features are assigned to the appropriate machines, the leader then sends this allocation information to the optimization agent. The optimization agent finds optimal/near-optimal process plans and schedules via the hybrid tabu-SA algorithm.
Item Type: | Article |
---|---|
Source: | Copyright of this article belongs to Springer London. |
Keywords: | Multi-agent system; Integrated process planning and scheduling; Dynamic tool cost; C-fuzzy decision trees; Hybrid tabu-SA algorithm. |
ID Code: | 139657 |
Deposited On: | 27 Aug 2025 11:38 |
Last Modified: | 27 Aug 2025 11:38 |
Repository Staff Only: item control page