Initial results in SST-1 after up-gradation

Pradhan, S ; Khan, Z ; Tanna, V L ; Prasad, U ; Paravastu, Y ; Raval, D C ; Masand, H ; Kumar, Aveg ; Dhongde, J R ; Jana, S ; Kakati, B ; Patel, K B ; Bhandarkar, M K ; Shukla, B K ; Ghosh, D ; Patel, H S ; Parekh, T J ; Mansuri, I A ; Dhanani, K R ; Varadharajulu, A ; Khristi, Y S ; Biswas, P ; Gupta, C N ; George, S ; Semwal, P ; Sharma, D K ; Gulati, H K ; Mahajan, K ; Praghi, B R ; Banaudha, M ; Makwana, A R ; Chudasma, H H ; Kumar, M ; Manchanda, R ; Joisa, Y S ; Asudani, K ; Pandya, S N ; Pathak, S K ; Banerjee, S ; Patel, P J ; Santra, P ; Pathan, F S ; Chauhan, P K ; Khan, M S ; Thankey, P L ; Prakash, A ; Panchal, P N ; Panchal, R N ; Patel, R J ; Mahsuria, G I ; Sonara, D P ; Patel, K M ; Jayaswal, S P ; Sharma, M ; Patel, J C ; Varmora, P ; Srikanth, G L N ; Christian, D R ; Garg, A ; Bairagi, N ; Babu, G R ; Panchal, A G ; Vora, M M ; Singh, A K ; Sharma, R ; Nimavat, H D ; Shah, P R ; Purwar, G ; Raval, T Y ; Sharma, A L ; Ojha, A ; Kumar, S ; Ramaiya, N K ; Siju, V ; Gopalakrishna, M V ; Kumar, A ; Sharma, P K ; Atrey, P K ; Kulkarni, SV ; Ambulkar, K K ; Parmar, P R ; Thakur, A L ; Raval, J V ; Purohit, S ; Mishra, P K ; Adhiya, A N ; Nagora, U C ; Thomas, J ; Chaudhari, V K ; Patel, K G ; Dalakoti, S ; Virani, C G ; Gupta, S ; Kumar, Ajay ; Chaudhari, B ; Kaur, R ; Srinivasan, R ; Raju, D ; Kanabar, D H ; Jha, R ; Das, A ; Bora, D (2017) Initial results in SST-1 after up-gradation Journal of Physics: Conference Series, 823 . 012004. ISSN 1742-6588

Full text not available from this repository.

Official URL: http://doi.org/10.1088/1742-6596/823/1/012004

Related URL: http://dx.doi.org/10.1088/1742-6596/823/1/012004

Abstract

SST-1 Tokamak has recently completed the 1st phase of up-gradation with successful installation and integration of all its First Wall components. The First Wall of SST-1 comprises of ∼ 3800 high heat flux compatible graphite tiles being assembled and installed on 132 CuCrZr heat sink back plates engraved with ∼ 4 km of leak tight baking and cooling channels in five major sub groups equipped with ∼ 400 sensors and weighing ∼ 6000 kg in total in thirteen isolated galvanic and six isolated hydraulic circuits. The phase-1 up-gradation spectrum also includes addition of Supersonic Molecular Beam Injection (SMBI) both on the in-board and out-board side, installation of fast reciprocating probes, adding some edge plasma probe diagnostics in the SOL region, installation and integration of segmented and up-down symmetric radial coils aiding/controlling plasma rotations, introduction of plasma position feedback and density controls etc. Post phase-I up-gradation spanning from Nov 2014 till June 2016, initial plasma experiments in up-graded SST-1 have begun since Aug 2016 after a brief engineering validation period in SST-1. The first experiments in SST-1 have revealed interesting aspects on the 'eddy currents in the First Wall support structures' influencing the 'magnetic Null evolution dynamics' and the subsequent plasma start-up characteristics after the ECH pre-ionization, the influence of the first walls on the 'field errors' and the resulting locked modes observed, the magnetic index influencing the evolution of the equilibrium of the plasma column, low density supra-thermal electron induced discharges and normal ohmic discharges etc. Presently; repeatable ohmic discharges regimes in SST-1 having plasma currents in excess of 65 KA (qa ∼ 3.8, BT = 1.5 T) with a current ramp rates ∼ 1.2 MA/s over a duration of ∼ 300 ms with line averaged densities ∼ 0.8 × 1019 and temperatures ∼ 200 eV with copious MHD signatures have been experimentally established. Further elongation of the plasma duration up to one second or more with position and density feedback as well as coupling of Lower Hybrid waves are currently being persuaded in SST-1 apart from increasing the core plasma parameters with further optimizations and with wall conditioning.

Item Type:Article
Source:Copyright of this article belongs to Institute of Physics Publishing.
ID Code:135285
Deposited On:20 Jan 2023 10:48
Last Modified:20 Jan 2023 10:48

Repository Staff Only: item control page